«Breaking new paths for the development of sound and music by providing opportuities for creative people who work away from the mainstream»
Nia Schmidheiny [2003]
Sound Development
Sound Development is located at the Lavaterstrasse 44 in 8002 Zurich, Switzerland.
The studio is mainly designed as a creative/ production facility with mixing capabilities in a good atmosphere. It includes besides the control room, a vocal booth and two large and flexible rooms for recording. The larger of the two has daylight and a bright, natural reverb, the smaller is in the basement and has a shorter, crisp sound, good for drums and amps. Both rooms are linked to one another via the control room.
Big Room
1st floor, Lavaterstrasse 44, 8002 Zurich, Switzerland
154 m²
- Main recording room (24/4), Talkback system
- Flexible and modular equipped
- Works great for showcases/ live recordings with audience capacity of up to +/- 100 peoples
- Daylight
- No air-condition
- Non-smoker
Equipment list big room [PDF]
Floorplan big room [PDF]
Control Room
1st floor, Lavaterstrasse 44, 8002 Zurich, Switzerland
23 m²
- 2.0 Control Room with Acoustic design by WSDGe
WSDG.COM - Monitoring: ATC SMC25Pro on a Trinnov System
- ProTools HDX 11.3.1 on MacPro 2x 2.4 GHz 6-Core,
32GB, 10.8.5 - D-Command with 24 Faders
- Vocal booth by Studio Box GmbH STUDIOBOX.DE
- Daylight
- Air-condition
- Non-smoker
equipment list [PDF]
Floorplan control room [PDF]
Measurement report [PDF]
UG
Basement, Lavaterstrasse 44, 8002 Zurich, Switzerland
137 m²
- Recording room (12/4)
- Concert room with club ambiance
- Backstage for concerts with toilet & shower
- Rehearsal room
- Smoker area
- No air-condition / strong ventilation
Equipment List ug [PDF]
Floorplan UG [PDF]
Sound Development AG
Lavaterstrasse 44
8002 Zurich
Switzerland
+41 43 344 97 12
info@sound-development.com
Route Planer (Google Maps)
Swiss Federal Railways (sbb.ch)
Local Transportation (vbz.ch)